CLIENT | DESCRIPTION |
---|---|
African Gas and Oil Limited. | Front End Engineering Design For New LPG Facility of 50,000 MT in 3
different phase’s adjutant to existing LPG Facility. The project executed in
phase wise as 10000 M. Tons capacity in phase I and phase II and 30000 M. Tons
capacities in phase III. |
African Gas and Oil Limited. | Detail Engineering For New LPG Facility of 50,000 MT in 3 different
phase’s adjutant to existing LPG facility. The project executed in phase wise
as 10000 M. Tons capacity in phase I and phase II and 30000 M. Tons capacities
in phase III. |
SHV Energy Pakistan (Pvt.) Limited | Design, Detailed Engineering and Top Supervision of Mounded LPG Vessels
(05 Nos.) of 250 M. Ton each with associated Piping at LPG Plant-PQA of SHV
Energy Pakistan Ltd. |
Shell Hong Kong | LPG Market Study in Hong Kong for Shell Hong Kong Ltd., Chevron Hong
Kong Ltd. and CRC Petrochem Group-China. It also included basic design of
Refrigerated LPG Storage Facility with Technical Audit of existing Pressurized
LPG Storage Facility at CRC Terminal-Hong Kong |
SHV Energy Pakistan (Pvt.) Limited | Design and Detailed engineering of LPG Bulk Storage facility at Dhodak |
SHV Energy Pakistan (Pvt.) Limited | LPG Storage & Handling Facilities at ADHI |
SHV Energy Pakistan (Pvt.) Limited | Design and Detailed engineering of LPG Bulk Storage (mounded type)
facility with Bottling Plant at Lahore. |
Pakistan Petroleum Ltd. | Preparation of EPCC bid package for Dismantling, Shifting, installation
and commissioning of 3 nos. LPG vessel of Adhi Gas field. |
Pakistan Petroleum Ltd. | Design of Re-location of 3 nos. LPG Bullets with associated piping,
pumps, metering stations, odorization unit, fire fighting system at Adhi LPG
Plant of PPL. |
Jamshoro Joint Venture Ltd. | Basic Design as per Third Party Inspector requirements of existing LPG
Extraction Plant and Storage Facilities of Jamshoro Joint Venture Ltd. (JJVL). |
Chevron Pakistan Ltd. | Design, Detailed Engineering and Top Supervision of Mounded LPG Vessel of 100 M.Ton with associated Piping at LPG Plant # 1 |
Gulf and Maritime Co. (GUMMOS) | Design of LPG Handling Facility at Port Qasim |
Gulf and Maritime Co. (GUMMOS) | Design and Detailed Engineering of LPG Pipeline Dia. 10”-5 Km long from
FOTCO Port to P-1 Point |
Pakistan State Oil Co. Ltd. | Design of LPG Re-fuelling Stations (100 Nos. Auto Gas Stations). |
Byco Petroleum Limited | Design and Detailed Engineering of LPG Bullet 250 M.Tons Capacity |
Byco Petroleum Limited | Design and Detailed Engineering of LPG Village having 20 LPG Terminals |
Pakistan State Oil Company Ltd. | Design of LPG Re-Fueling Station (Auto Gas Station) 100 Nos. |
Shell Kenya Ltd. | Technical Audit of existing LPG facility and fire fighting system of Shimanzi Installation at Mambasa-Kenya |
Shell Togo. | Technical Audit of existing LPG facility and fire fighting system of S.T.S.L. Depot at Lome-Togo |
Shell Hong Kong Ltd. | Technical Audit of existing LPG Storage Facilities at Tsing Yi Island Installation. |
Foundation Gas. | Technical Audit of existing LPG Storage Facilities near NRL-Karachi. |
Chevron Pakistan Ltd. | Technical Audit of existing LPG Storage Facilities at LPG Plant # 1 (near PRL Karachi) |